The San Mateo Resource Conservation District (RCD) is seeking qualified contractors to bid on the Butano Creek Channel Reconnection and Resiliency Project.

This is a multi-benefit project that requires a number of construction related specialties including: work in sensitive natural environments; protection of water quality and aquatic species during construction; suction dredging and beneficial re-use of dredge slurry; terrestrial excavation and beneficial re-use of excavated sediments; construction of instream structures made from rock and wood; and installation of instream dams for water quality control and dewatering purposes.   

Bids for the Butano Creek Channel Reconnection and Resiliency Project must be received by the RCD by 5:00 p.m. on December 11th, 2018 at the following email address: andrew@sanmateoRCD.org.

The RCD will be holding a bid walk on Tuesday, November 13th from 10AM to 12:30PM. Attendance at the bid walk is mandatory for all prospective bidders. If planning to attend, RSVP to Andrew Hall by email at andrew@sanmateoRCD.org.
Meeting location is at the dirt pull out on the north side of Pescadero Creek Road, adjacent to the intersection with HWY 1. (click for directions from Half Moon Bay).

You can download the RFB and Basis of Design Report here.